Photos
Project Details
Name of Project: Hood River Schools Energy Upgrades
Date Project Started: 6/1/10
Date Project Completed: 9/1/10
Project Manager: Matt Keikkala
Location: Hood River
Industry: Education
Project Features: Energy System Upgrades
Size of Building (Square Feet): Multiple Buildings
General Contractor: McKinstry Energy Group
Owner: Hood River School District
Project Synopsis: This project was a design build HVAC upgrades and took place in (4) different schools. We installed new Air Handling Units, Boilers and full HVAC systems throughout the (4) schools. This project also had a very tight schedule in that all of the work was completed over the summer break of 2010.
Request More Details
* Indicates required fields