Project Details
Name of Project: Maxim Integrated Retrofit Upgrades
Date Project Started: November 2012
Date Project Completed: On-Going
Project Manager: Steve O’Shaughnessy
Location: Beaverton, OR
Industry: Micro Electronics / Semi-Conductor
Project Photo Features: 600 GPM Custom Modular Process Cooling Water Skid
Size of Building (Square Feet): 403,200
Prime Contractor: Owner Direct
Owner: Maxim Integrated
Project Synopsis: Upgrade Process Piping and Utilities to handle increased capacities required for changing 6” Wafer Tools to 8” Tools. Charter Mechanical, has been challenged to upgrade Process Piping, HVAC Piping, and High Purity Piping, needed to facilitate newly installed owner furnished tools, while maintaining operation of the existing operating Fab. All critical-path piping work is scheduled with owner to insure no impact occurs to the facility which operates 24/7 hours per week.